Here are the shop diagrams for our house’s SIP panels which are scheduled to arrive on Monday, May 20th. It should be very interesting to watch the jigsaw puzzle get put together over the next 2 weeks; a total of 10 roof panels, and 48 wall panels.
Wall #3 is the South side, wall #6 is the East side.