Slabs and SIP’s

The slabs for the house and for the garage are down and curing.

slabs

We are waiting for the SIP’s to arrive next week on May 20th, and a week later  the outer walls and roof should be up and assembled.  Can’t wait…

Diane and I got a ride on a very small 2 1/2 seat airplane last week, here is what the building site looks like from about 1200 feet up:

S

This entry was posted in Uncategorized. Bookmark the permalink.