The slabs for the house and for the garage are down and curing.
We are waiting for the SIP’s to arrive next week on May 20th, and a week later the outer walls and roof should be up and assembled. Can’t wait…
Diane and I got a ride on a very small 2 1/2 seat airplane last week, here is what the building site looks like from about 1200 feet up:

